Re-Fuel Inspection, Maintenance Plant Including Electrical Work – Safe Work Method Statement

Sale!

Re-Fuel Inspection, Maintenance Plant Including Electrical Work – Safe Work Method Statement

$55.00

Description

Re-fuel inspection, maintenance plant including electrical work Information:

The Re-fuel inspection, maintenance plant including electrical work Work Method Statement (SWMS) is a comprehensive 10 page procedure. This SWMS covers general aspects associated Re-fuel inspection, maintenance plant including electrical work.

– TheRe-fuel inspection, maintenance plant including electrical work Work Method Statement (WMS) is ready to use.
– Simply add your company details, ABN.
– Include any site specific details or risks and make it specific to the task at hand.
– It is then ready to be incorporated as part of your overall Workplace health and Safety System.
– To be used as part of your Workplace health and Safety inductions, Tool box talks or tender applications.

Product Details:

– Compliant with AS 4801
– 10 Page procedure
– Written by experienced Workplace health and Safety consultants
– Risk ratings before and after control measures
– Easily manageable word format
– Site specific and task specific details added easily
– Includes easy to complete boxes for Company details and project details
– Employee sign off section
– Referenced