Concrete Placement to Pits & Pipes – Safe Work Method Statement

Sale!

Concrete Placement to Pits & Pipes – Safe Work Method Statement

$55.00

Description

Concrete placement to pits and pipes Information:

The Concrete placement to pits and pipes Work Method Statement (SWMS) is a comprehensive 6 page procedure. This SWMS covers general aspects associated with the Concrete placement to pits and pipes.

– The Concrete placement to pits and pipes Work Method Statement (WMS) is ready to use.

– Simply add your company details, ABN.

– Include any site specific details or risks and make it specific to the task at hand.

– It is then ready to be incorporated as part of your overall Workplace health and Safety System.

– To be used as part of your Workplace health and Safety inductions, Tool box talks or tender applications.

 

Product Details:

–  Compliant with AS 4801

–  6 Page procedure

–  Written by experienced Workplace health and Safety consultants

–  Risk ratings before and after control measures

–  Easily manageable word format

–  Site specific and task specific details added easily

–  Includes easy to complete boxes for Company details and project details

–  Employee sign off section

–  Referenced