Safety Management Plan – Principal Contractor, Low Rise Builder

Safety Management Plan – Principal Contractor, Low Rise Builder

$1,250.00

This Comprehensive Safety Management Plan

A complete system of all required documentation. Safety Management Plan Contractors

Description

This Safety Management Plan is compiled to comply with Australian Workplace Act and Regulations, Australian/New Zealand Standards and Codes of Practice.

Downloadable file is a compressed Zip file which when expanded, includes documents in Microsoft Word format to allow easy editing and addition of your own Company and Project details.

This Comprehensive Safety Management Plan includes:

Construction Management Plan

  • Company Detail
  • Development approval requirements
  • Site Establishment and Maintenance  
  • Community Awareness
  • Site Safety
  • Site Maintenance and Security
  • Onsite Management
  • Site Operation Times:
  • Stage Programming
  • First Aid:
  • Community Safety:
  • Communication:
  • Construction Management Plan  
  • Pedestrian Management:
  • Existing kerb side infrastructure:
  • Delivery Access to Site:
  • Council Assets:
  • Loading and Unloading of Materials
  • Materials and Plant Stored on Site
  • Material Handling
  • Site Fences:
  • Parking:
  • Phases of Construction:
  • Fire Exit Routes:
  • Traffic Management:

Site Safety Plan inclusions

  • SITE MANAGER / FOREMAN ROLES AND RESPONSIBILITIES WHS – All Site Activity Procedures
  1. Occupational Health & Safety Policy Statement
  2. Project Description
  3. Project Risk Assessment
  4. Site Set Up and Facilities Plan
  5. Site Construction Phase Facilities Plan
  6. Public Protection Controls
  7. Temporary Power
  8. Site Rules
  9. Site Inspections
  10. Emergency Procedure and Evacuation Plan
  11. Emergency Contacts (local medical help, ambulance, police, WHS and ADD COMPANY management and safety consultant)

First Aid & Accident Procedure  – PROJECT REPORTS

  • Project Risk Assessment Report – Attachment 1
  • Safety in Design Report – Attachment 2
  • Site Start up – Attachment 3
  • Operational Works – Attachment 4
  • Appendices and Forms – Attachment 5

Dust Management Plan

  • Site works
  • Subcontractor practices

Site Safety appendices inclusions

  • WH&S Policy Statement
  • Site Safety Administration Flow Chart
  • Project Commencement Safety & Environment Checklist
  • Site Amenity Requirements
  • Project Forms – Displayed on Site and Files to be Maintained
  • Subcontractor Register
  • JSA / WMS Template
  • Subcontractor SWMS Checklist
  • Subcontractor OH&S Evaluation Checklist
  • Site Specific Induction (Scope)
  • Induction Training Record Form
  • Site Induction Register
  • Training and Competency Register
  • Toolbox Talk Record
  • Site Inspection Checklist
  • Monthly WHS Report
  • Task Observation Sheet
  • Hazard/Non-Compliance (HNC) Report Form
  • WHS Committee
  • WHS Representatives & Committee Outline
  • WHS Representatives
  • Sample WHS Committee Agenda
  • Log of First Aid Treatments
  • Incident Report Form
  • Dangerous Incident – Definitions
  • WHSQ Incident Record / Report Form
  • Plant and Equipment Register
  • Electrical Register
  • Hazardous Chemical Register
  • Hot Work Permit
  • Emergency Evacuation Drill
  • Confined Space Entry Permit
  • Scaffold Inspection Checklist (Weekly)

Project Risk Assessments inclusions

  • Concrete Pumping
  • Contracted Crane Activities
  • Demolition
  • Electricity
  • Elevating Work Platforms
  • Excavation and Trenching
  • Explosive Powered Tools
  • Fire Protection
  • First Aid
  • Formwork
  • Hazardous Substances
  • Lighting
  • Manual Handling
  • Noise
  • Penetrations
  • Personal Protective Equipment
  • Plant & Equipment
  • Portable Power Tools
  • Public Protection
  • Reinforcing bars
  • Scaffolding
  • Swing Stage Suspended Scaffolds
  • Slips, Trips & Falls
  • Steel Erection
  • Tilt-up Construction
  • Traffic & Roadway Management
  • Welding and Hot Work
  • Work at Heights
  • Personal Fall Protection

 

Safety Health and Environmental Work Method Statements

( to assist with beginning project includes-)

  • SH&EWMS – Manual handling
  • SH&EWMS – Refuelling of portable generator
  • SH&EWMS – Safe Operation of over 11m boom lift
  • SH&EWMS – Safe Use of Handling Hazardous Substances
  • SH&EWMS operate forklift
  • SH&EWMS Site Labour
  • SH&EWMS operate telehandler
  • SH&EWMS Safe work from scaffold and work platforms
  • SH&EWMS template

Staff Safety Training Package inclusions

  • EMPLOYEE TRAINING REGISTER
  • Falls at Work Training
  • Fire Awareness and Response Training
  • Hazardous Substances Training
  • Manual Handling Training

Construction Safety Checklists

  • GENERAL OHS AUDIT CHECKLIST
  • WHS PRESTART
  • SITE SAFETY
  • TRAFFIC MANAGEMENT AND CONTROL
  • Concrete Pump Checklist
  • Mobile Crane Checklist
  • Mobile Plant Checklist