Tower Crane Base install

Sale!

Tower Crane Base install

Original price was: $110.00.Current price is: $95.00.

The Tower Crane Base Installation is a comprehensive 9 page procedure. This covers general aspects associated with Tower Crane Base Installs.

Description

Tower Crane Base Install Information:

The Tower Crane Base Installation is a comprehensive 9 page procedure.

This covers general aspects associated with Tower Crane Base Installs.

  • –Tower Crane Base Install Work Method Statement (WMS) is ready to use.
  • – Simply add your company details, ABN.
  • – Include any site specific details or risks and make it specific to the task at hand.
  • – It is then ready to be incorporated as part of your overall workplace health and safety System.
  • – To be used as part of your workplace health and safety inductions, Tool box talks or tender applications.

Product Details:

  • – Compliant with AS 4801
  • – 9 Page procedure
  • – Written by experienced workplace health and safety consultants
  • – Risk ratings before and after control measures
  • – Easily manageable word format
  • – Site specific and task specific details added easily
  • – Includes easy to complete boxes for Company details and project details
  • – Employee sign off section
  • – Referenced