Safe Use of Man/Sully Box

Sale!

Safe Use of Man/Sully Box

Original price was: $90.00.Current price is: $75.00.

The Safe Use of Man/Sully Box is a comprehensive 10 page procedure.

This covers general aspects associated with the Safe Use of Man/Sully Box.

Description

Safe Use of Man/Sully Box Information:

The Safe Use of Man/Sully Box is a comprehensive 10 page procedure.

This covers general aspects associated with the Safe Use of Man/Sully Box.

– Safe Use of Man/Sully Box Work Method Statement (WMS) is ready to use.

– Simply add your company details, ABN.

– Include any site specific details or risks and make it specific to the task at hand.

– It is then ready to be incorporated as part of your overall workplace health and safety System.

– To be used as part of your workplace health and safety inductions, Tool box talks or tender applications.

Product Details:

– Compliant with AS 4801

– 10 Page procedure

– Written by experienced workplace health and safety consultants

– Risk ratings before and after control measures

– Easily manageable word format

– Site specific and task specific details added easily

– Includes easy to complete boxes for Company details and project details

– Employee sign off section

– Referenced