Description
Personnel Hoist Install Information:
The Personnel Hoist Install is a comprehensive 13 page procedure.
This covers general aspects associated with the Personnel Hoist Install.
- –Personnel Hoist Install Safe Work Method Statement (WMS) is ready to use.
- – Simply add your company details, ABN.
- – Include any site specific details or risks and make it specific to the task at hand.
- – It is then ready to be incorporated as part of your overall workplace health and safety System.
- – To be used as part of your workplace health and safety inductions, Tool box talks or tender applications.
Product Details:
- – Compliant with AS 4801
- – 13 Page procedure
- – Written by experienced workplace health and safety consultants
- – Risk ratings before and after control measures
- – Easily manageable word format
- – Site specific and task specific details added easily
- – Includes easy to complete boxes for Company details and project details
- – Employee sign off section
- – Referenced




