Dogman / Rigging Operations

Sale!

Dogman / Rigging Operations

$75.00

The SAFE WORK METHOD STATEMENT DOGMAN/RIIGING OPERATIONS is a comprehensive 20 page procedure assessing general risks associated with Dogman / Rigging Operations.

Description

Dogman / Rigging Operations set up and use Information:

The Dogman / Rigging Operations document is a comprehensive 20 page procedure covering general aspects associated with Dogman / Rigging Operations.

  • –The Dogman / Rigging Operations Work Method Statement (WMS) is ready to use.
  • – Simply add your company details, ABN.
  • – Include any site specific details or risks and make it specific to the task at hand.
  • – It is then ready to be incorporated as part of your overall Workplace Health and Safety System.
  • – To be used as part of your Workplace Health and Safety inductions, Tool box talks or tender applications.

Product Details:

  • – Compliant with AS 4801
  • – 20 Page procedure
  • – Written by experienced Workplace Health and Safety consultants
  • – Risk ratings before and after control measures
  • – Easily manageable word format
  • – Site specific and task specific details added easily
  • – Includes easy to complete boxes for Company details and project details
  • – Employee sign off section
  • – Referenced